DAX AND DATA MODELLING

Build fast, reliable Power BI measures with the right DAX

We develop the ratios, period comparisons, cumulative values and business-rule measures your Power BI model needs. The goal is not only to return a result, but to deliver measures that are correct in filter context, understandable and maintainable.

DAX CODE AND MEASURESReal project view
Power BI DAX query and measure code screenDAX query view
Profitability • period comparison • performance

SCOPE

What can be delivered with this service?

01

DAX measures and calculations

02

YTD, MTD and prior-period comparisons

03

Filter-context and relationship troubleshooting

04

Performance optimisation for slow measures

USE CASES

Solutions tailored to your workflow

DAX measure development, time intelligence, data modelling, troubleshooting and Power BI performance consulting. Project scope is defined by evaluating the current data structure and user needs together.

  • ✓Profitability and margin calculations
  • ✓Budget-versus-actual and variance measures
  • ✓Running totals and moving averages
  • ✓Department, property and user-level calculations

APPROACH

A controlled and transparent delivery process

We first understand the problem and the data, then develop through small, verifiable steps.

  1. 1

    Requirements analysis

    Users, process, outputs and success criteria are defined.

  2. 2

    Technical review

    Files, data sources, access methods and business rules are reviewed.

  3. 3

    Development and validation

    The solution is built and interim results and calculations are validated together.

  4. 4

    Delivery and handover

    Usage, maintenance points and required documentation are handed over.

FREQUENTLY ASKED QUESTIONS

DAX Development: frequently asked questions

Can I get help with a single DAX measure?+

Yes. When the requirement, model structure and expected result are clear, support can be scoped to a single measure or error.

Why does a DAX measure show the wrong total?+

Row context, filter context, relationships, granularity or measure design can cause the total row to behave differently from expectations.

Can DAX performance be improved?+

Yes. Model size, relationships and measure structure can be reviewed to reduce unnecessary iterations and expensive calculations.

FREE DISCOVERY CALL

Let's discuss your DAX Development requirements

Tell us briefly about your current file, data source and target output. We will assess the right solution together.

CONTACT DOĞAN MIH DIRECTLY 055294809 66 Describe your project on WhatsApp → No email address is published. Please contact us directly by phone or WhatsApp.
Call WhatsApp